Video Tutorial Index
Video Tutorial Index
This index is an alphabetical listing of all available ConstructEx video tutorials. For a listing of videos by category, please see the Video Tutorials page.
Adding a Construction Phase Package (Duration 9m:26s)
Adding a Design/Bid Package (Duration 7m:01s)
Adding and Issuing a New Field Report (Duration 8m:10s)
Adding a Field Report Item to an Issued Field Report (Duration 3m:50s)
Adding a Meeting (Duration 5m:03s)
Adding a Message (Duration 4m:30s)
Adding a Submittal as a Subcontractor or Contractor (Duration 4m:56s)
Adding a User (Duration 3m:46s)
Adding an RFI as a Subcontractor or Contractor (Duration 4m:19s)
Adding and Editing Message Forum Categories (Duration 3m:32s)
Answer an RFI as a Design Team Lead (Duration 5m:41s)
Answer an RFI as a Secondary Reviewer (Duration 5m:44s)
Close a Submittal as a Contractor (Duration 3m:59s)
Close an RFI as a Contractor (Duration 4m:24s)
Configure the Submittals Module and Prepare the Template for Import (Step 2) (Duration 4m:52s)
Configuring the Construction Phase Documents Module (Duration 6m:51s)
Configuring the Design/Bid Packages Module (Duration 3m:07s)
Configuring the Field Reports Module (Duration 4m:29s)
Configuring the Meeting Minutes Module (Duration 3m: 26s)
Configuring the RFIs Module (Duration 6m:25s)
Configuring the Submittals Module (Duration 6m:26s)
Creating a Logo (Duration 7m:36s)
Creating a Register Using the Submittal Register Grid (Duration 10m:20s)
Creating a Sheet or Specification Index from the Template (Duration 4m:38s)
Creating a Spatial Index from the Template (Duration 4m:32s)
Creating Cover Sheets (Duration 14m:50s)
Creating Quality Control Items with the Capture App (Duration: 8m:26s)
Deleting a Sheet or Specification Index (Duration 1m:48s)
Downloading a Current Set of Drawings and Specifications (Duration 3m:51s)
Field Management Training (Duration 40m:26s)
Forward a Submittal as a Design Team Lead (Duration 2m:39s)
Forward an RFI as a Design Team Lead (Duration 3m:18s)
Import the Submittal Register Into Your Project (Step 3) (Duration 3m:51s)
Importing a Sheet or Specification Index (Duration 2m:30s)
Importing a Spatial Index (Duration 4m:08s)
Introduction to ConstructEx Spatial Index and Quality Control (Duration 29m:45s)
Maintaining a Current Set of Drawings and Specifications (Duration 6m:01s)
Maintaining a Submittal Register (Duration 4m:41s)
Populate the Submittal Register Template (Step 1) (Duration 5m:10s)
Printing and Generating Reports with the All+Expected Log (Duration 6m:13s)
Purging an Existing Spatial Index (Duration 2m:56s)
Return a Submittal as a Design Team Lead (Duration 4m:48s)
Return a Submittal as a Secondary Reviewer (Duration 4m:41s)
The Submittal and RFI Workflow (Duration 7m:49s)
User Role Display Names (Duration 5m:56s)
Using a Submittal Register (Duration 6m:46s)
Using the All+Expected Log (Duration 6m:35s)
Using the Field Reports App (Duration 9m:25s)
Using the Markup Tools (Duration 6m:00s)
Using the Plans App (Duration 16m:06s)
Using the Tasks App (Duration 8m:07s)