NCX Submittals Videos
Submittals Videos
Click on a video to view it.
If you prefer to download the video, right click on it and select the appropriate save option from your browser’s popup menu.
Submittals
|
The Submittal and RFI Workflow Duration (7m:49s) |
|
Adding a Submittal as a Subcontractor or Contractor Duration (4m:56s)
|
|
Configuring the Submittals Module Duration (6m:26s) |
|
Printing and Generating Reports with the All+Expected Log Duration: (6m:13s) |
|
Using the All+Expected Log Duration (6m:35s) |
|
Forward a Submittal as a Design Team Lead Duration (2m:39s) |
|
Return a Submittal as a Design Team Lead Duration (4m:48s) |
|
Return a Submittal as a Secondary Reviewer Duration (4m:41s) |
|
Close a Submittal as a Contractor Duration (3m:59s) |
Submittal Register
|
Populate the Submittal Register Template (Step 1) Duration: (5m:10s) |
|
Configure the Submittals Module and Prepare the Template for Import (Step 2) Duration (4m:52s) |
|
Import the Submittal Register Into Your Project (Step 3) Duration (3m:51s) |
|
Maintaining a Submittal Register Duration (4m:41s) |
|
Using a Submittal Register Duration (6m:46s) |
